Insigma Engineering
Home  |  About us  |  Industry  |  Honor  |  News  |  Message  |  Project cases
Home > News > Company > Conclusion of Shenhua Baotou Coal to Olefins Project FGD Plant EPCEPC Contract
Conclusion of Shenhua Baotou Coal to Olefins Project FGD Plant EPCEPC Contract
--www.zdwxjd.com-- 发布时间:2007-11-26 阅读次数:1
减小字体 增大字体(双击滚屏)

The EPC contract for Shenhua Baotou Coal to Olefins Project FGD Plant was signed by Zhejiang Zheda Insigma M&E Engineering Co., Ltd. and Shenhua Baotou Coal Chemical Co., Ltd. in November 2007.

The scope of work includes but not limited to project management, administrative management, project design, purchase, construction, startup through completion acceptance necessary for successful realization of the said plant, including personnel training, instructions and assistance to the Owner during warranty period.

It is predicated that the whole project will be commenced at the end of September 2007 and put into trial run at the end of September 2009.

来源: 作者:   】【关闭】【返回
Copyright © 2008 Insigma Mechanical & Electrical Engineering Co.,Ltd. All rights reserved.
Powered bychinapages.com
Contact us