Insigma Engineering
Home  |  About us  |  Industry  |  Honor  |  News  |  Message  |  Project cases
Home > Project cases > FGD Plants of yaomeng 2nd Power Plant, 2×600MW
FGD Plants of yaomeng 2nd Power Plant, 2×600MW
--www.zdwxjd.com-- 发布时间:2007-03-19 阅读次数:1
减小字体 增大字体(双击滚屏)

Owner:       

Yaomeng 2nd Power Plant

Site:         

Pingdingshan henan

Techniques:  

Wet Flue Gas Desulfurization

Plant Size :   

2×600MW

Continuously Stream Gas:

1900  t/h

No. Absorbers :

2

SO2  Removal:

≥95%

Treated Gas:

2151100  Nm3/h

Award year:

2007.05

 

 

 

 

 

 

来源: 作者:   】【关闭】【返回
Copyright © 2005 Insigma Mechanical & Electrical Engineering Co.,Ltd. All rights reserved.
Powered bychinapages.com
Contact us